Whole-Home Remodeling in Portland

A whole-home remodel touches layout, structure, systems and finishes at once. It is the project most likely to go wrong in the field, and the one that rewards detailed preconstruction and disciplined budgeting most.

SW Portland whole-home remodel — finished living space opening to the new kitchen
Whole-home remodel · 1947 single-level · SW PortlandSee this project →
OR CCB #221872Licensed, bonded and insured
Owner-ledDennis Skoro is accountable for every project
Oregon + WashingtonPortland metro and Clark County
Second-generation builder50+ years of family construction and real estate in Portland
Why it's complex here

Portland houses hide their problems well.

Most whole-home clients come to us with a house that no longer fits: closed-off rooms, one bathroom for a growing family, a kitchen at the wrong end of the plan. The finished result is the easy part to imagine. The hard part is everything between here and there.

In Portland's 1910s–1950s housing stock, that means knob-and-tube and galvanized plumbing, undersized framing, unpermitted past work, lead paint and asbestos, and a permit path that changes when you touch structure. A well-run whole-home remodel accounts for all of it before demolition, so hidden conditions become priced decisions instead of emergencies.

What's included

Every trade, scoped as its own line.

A typical scope table for this kind of project carries 25–45 line items. Each is owned by a specialist and priced individually, which is what makes the budget transparent.

Design & engineering

Layout studies, architect, structural engineer

Demolition & abatement

Selective demo, lead/asbestos, hauling

Structure & framing

Bearing-wall removal, beams, seismic ties

Electrical

Service upgrade, rewire, lighting

Plumbing

Re-pipe, new bath rough-in, water heater

HVAC

Ducting, heat pump, ventilation

Insulation & drywall

Envelope upgrades, finish level

Windows & doors

New openings, egress, exterior doors

Cabinets & counters

Kitchen, baths, built-ins, stone

Tile & flooring

Waterproofing, tile, hardwood refinish

Paint & finish carpentry

Trim, doors, interior and exterior paint

Permits, fees & cleaning

Jurisdiction fees, inspections, final clean

How we manage it

The work is sequenced before it is scheduled.

Our full process →
  1. 01

    Feasibility and layout

    In-house layout studies to test the program against structure, zoning and budget before design fees are spent.

  2. 02

    Architecture and engineering

    Stamped drawings and structural engineering by outside firms we coordinate and hold to the budget.

  3. 03

    Scope table and budget

    Every trade priced by its specialist. You see the line, the scope of work and the number.

  4. 04

    Permits and selections

    Permit submitted while selections are finalized against a schedule, so lead times never stall the site.

  5. 05

    Construction and communication

    Trade dispatch, inspections, weekly updates and written change approvals.

  6. 06

    Closeout

    Final inspection, punch list, warranty documentation and as-built records.

Investment

What drives the number.

Most whole-home remodels we take on fall between $200K and $750K+, depending on the drivers below. Ranges are drawn from Portland Project's signed contracts and reviewed annually.

Last reviewed September 2026. Planning guidance only; pricing is fixed only by a signed agreement after scope, selections and site conditions are known.

Whole-home remodel cost guide →

Structural changes

Bearing walls, new openings and foundation work add engineering, steel and inspection time.

Systems replacement

Full rewire, re-pipe and HVAC are common in pre-1960 homes and rarely optional once walls are open.

Kitchens and baths

The count of wet rooms and the selection level drive the largest single swings.

Hidden conditions

We recommend a 10–15% contingency on older homes and show you exactly how it is drawn.

Timeline

Plan for phases, not a date.

Durations depend on structural scope, permit review times and selection lead times. We commit to a schedule only once the scope is fixed.

Discovery and feasibility2–4 weeks
Design, engineering and scope6–12 weeks
Permit review (City of Portland)Varies by scope
Construction4–9 months
How long does a whole-home remodel take? →
Questions we hear

Whole-home remodel FAQ

Can we live in the house during the remodel?

Sometimes, in phases. If the kitchen, all bathrooms or the electrical service are in scope at once, moving out is usually cheaper and faster than phasing. We model both and show the cost difference.

Do we need an architect?

For structural changes and permits, yes—stamped drawings are required. We do early layout studies in-house, then bring in an architect and engineer we coordinate as part of the scope.

How do change orders work?

Any change to scope is written up as its own line with a price and a schedule impact, and approved by you before the work proceeds. Nothing is added to an invoice that you have not signed.

Who is on site day to day?

The specialist trade for that phase, dispatched and sequenced by us. Dennis or the project manager is on site at each phase transition and inspection, and reachable throughout.

Plan your whole-home remodel

Start with the house, the goals and a realistic number.

We'll tell you honestly whether the scope and investment line up before anyone books a site visit. Or call 503-567-5676.

Step 1 of 4 · Then the address, the project, and where to send your site-visit details. About two minutes.