A 1947 single-level home, re-planned around how the family actually lives
- Home
- 1947 single-level
- Area affected
- ~1,400 sf
- Project type
- Whole-home · layout · added bath
- Structural
- Bearing wall removed, engineered beam
- Jurisdiction
- City of Portland

A good house with the wrong plan.
A well-kept 1947 single-level home in Southwest Portland with a familiar postwar layout: a small formal entry, a kitchen closed off from the living room by a bearing wall, one full bathroom serving three bedrooms, and bedrooms sized for 1947 furniture.
The owners liked the neighborhood, the lot and the bones. They didn't want to move; they wanted the house to work for a family of four.
Open the core. Add a bath. Don't grow the footprint.
- Connect kitchen, dining and living into one usable space
- A proper entry with storage instead of a door into the living room
- A second full bathroom within the existing footprint
- Re-planned bedrooms so each has a real closet
- A budget that held, with hidden conditions priced as they appeared
What it took to get there.
Design & engineering
In-house layout studies; structural engineer for beam and point loads
Demolition
Selective interior demo, hauling, lead-safe practices
Framing
Bearing-wall removal, engineered beam, new entry and bath partitions
Plumbing
New full-bath rough-in and fixtures; kitchen relocation
Electrical
Kitchen and bath circuits, lighting plan, code updates
HVAC
Duct rework for the new plan; bath ventilation
Insulation & drywall
Patch and new, level-4 finish throughout affected areas
Cabinets, counters & tile
Kitchen cabinetry, stone, bath waterproofing and tile
Flooring, paint & finish
Hardwood patch and refinish; doors, trim, paint; final clean
Everything in a postwar house is connected.
Removing the kitchen wall meant carrying roof and ceiling loads to new points on a 1947 foundation, which had to be verified before the beam was sized. Fitting a second full bathroom inside the footprint meant rerouting supply and drain lines through a crawlspace never designed for it, and sequencing plumbing, framing and electrical in a tight space.
The permit touched structure, plumbing and electrical, so three inspections had to land in the right order without stalling the trades behind them.
Investigate first, price everything, then build in order.
We opened the ceiling and crawlspace at three points during preconstruction to confirm framing direction and foundation condition before the engineer sized the beam. That turned the biggest unknown into a fixed line item.
The scope table carried every trade as its own quoted line with an explicit contingency for the crawlspace plumbing. When old cast-iron drain needed replacing beyond the planned run, the owners got a written option with a price the same week and approved it before work continued.
Selections were locked to a schedule before demolition, so cabinetry and tile lead times never held up the site.




Same footprint. A different house.
One connected kitchen, dining and living space under an exposed engineered beam; a real entry with closet; two full bathrooms; three bedrooms each with a closet. No square footage added, and the structure and plumbing permitted and on record for the next owner.
“We knew what every line cost before demolition started. When we hit a hidden framing issue, Dennis had a written option and a price to us the same week.”