Whole-home remodel · SW Portland

A 1947 single-level home, re-planned around how the family actually lives

Home
1947 single-level
Area affected
~1,400 sf
Project type
Whole-home · layout · added bath
Structural
Bearing wall removed, engineered beam
Jurisdiction
City of Portland
SW Portland whole-home remodel — the opened kitchen with black cabinetry, white island and yellow refrigerator
The starting point

A good house with the wrong plan.

A well-kept 1947 single-level home in Southwest Portland with a familiar postwar layout: a small formal entry, a kitchen closed off from the living room by a bearing wall, one full bathroom serving three bedrooms, and bedrooms sized for 1947 furniture.

The owners liked the neighborhood, the lot and the bones. They didn't want to move; they wanted the house to work for a family of four.

The goals

Open the core. Add a bath. Don't grow the footprint.

  • Connect kitchen, dining and living into one usable space
  • A proper entry with storage instead of a door into the living room
  • A second full bathroom within the existing footprint
  • Re-planned bedrooms so each has a real closet
  • A budget that held, with hidden conditions priced as they appeared
Scope

What it took to get there.

Design & engineering

In-house layout studies; structural engineer for beam and point loads

Demolition

Selective interior demo, hauling, lead-safe practices

Framing

Bearing-wall removal, engineered beam, new entry and bath partitions

Plumbing

New full-bath rough-in and fixtures; kitchen relocation

Electrical

Kitchen and bath circuits, lighting plan, code updates

HVAC

Duct rework for the new plan; bath ventilation

Insulation & drywall

Patch and new, level-4 finish throughout affected areas

Cabinets, counters & tile

Kitchen cabinetry, stone, bath waterproofing and tile

Flooring, paint & finish

Hardwood patch and refinish; doors, trim, paint; final clean

What made it complex

Everything in a postwar house is connected.

Removing the kitchen wall meant carrying roof and ceiling loads to new points on a 1947 foundation, which had to be verified before the beam was sized. Fitting a second full bathroom inside the footprint meant rerouting supply and drain lines through a crawlspace never designed for it, and sequencing plumbing, framing and electrical in a tight space.

The permit touched structure, plumbing and electrical, so three inspections had to land in the right order without stalling the trades behind them.

The approach

Investigate first, price everything, then build in order.

We opened the ceiling and crawlspace at three points during preconstruction to confirm framing direction and foundation condition before the engineer sized the beam. That turned the biggest unknown into a fixed line item.

The scope table carried every trade as its own quoted line with an explicit contingency for the crawlspace plumbing. When old cast-iron drain needed replacing beyond the planned run, the owners got a written option with a price the same week and approved it before work continued.

Selections were locked to a schedule before demolition, so cabinetry and tile lead times never held up the site.

The finished house
The outcome

Same footprint. A different house.

One connected kitchen, dining and living space under an exposed engineered beam; a real entry with closet; two full bathrooms; three bedrooms each with a closet. No square footage added, and the structure and plumbing permitted and on record for the next owner.

“We knew what every line cost before demolition started. When we hit a hidden framing issue, Dennis had a written option and a price to us the same week.”
Homeowners · SW Portland