Portland Project
Call
Call 503-567-5676 Plan Your Project

Design & Preconstruction Services in Portland

Turn an idea into a buildable, priced scope before anyone swings a hammer. Feasibility, layout studies, architect and engineer coordination, permit strategy and a line-by-line budget you can take to the bank, literally.

Open kitchen and dining under exposed beams, planned around a new sliding wall to the deck
Whole-home remodel · SW Waterfront hillside, PortlandSee this project →
OR CCB #221872Licensed, bonded and insured
Owner-ledDennis Skoro is accountable for every project
Oregon + WashingtonPortland metro and Clark County
Second-generation builder50+ years of family construction and real estate in Portland
Why it's complex here

The cheapest time to fix a problem is on paper.

Most remodel budgets blow up because the scope was never fully defined before the price was quoted. Preconstruction is where we open a few walls, confirm the structure, test the layout against zoning and cost, and write the scope table with real specialist quotes.

You leave with permit-ready drawings, a priced scope and a schedule. You can build it with us or take it to bid. Most clients build with us, because the number holds.

What's included

Every trade, scoped as its own line.

A typical scope table for this kind of project carries 25–45 line items. Each is owned by a specialist and priced individually, which is what makes the budget transparent.

Design & engineering

Layout studies, architect, structural engineer

Demolition & abatement

Selective demo, lead/asbestos, hauling

Structure & framing

Bearing-wall removal, beams, seismic ties

Electrical

Service upgrade, rewire, lighting

Plumbing

Re-pipe, new bath rough-in, water heater

HVAC

Ducting, heat pump, ventilation

Insulation & drywall

Envelope upgrades, finish level

Windows & doors

New openings, egress, exterior doors

Cabinets & counters

Kitchen, baths, built-ins, stone

Tile & flooring

Waterproofing, tile, hardwood refinish

Paint & finish carpentry

Trim, doors, interior and exterior paint

Permits, fees & cleaning

Jurisdiction fees, inspections, final clean

How we manage it

The work is sequenced before it is scheduled.

Our full process →
  1. 01

    Feasibility and layout

    In-house layout studies to test the program against structure, zoning and budget before design fees are spent.

  2. 02

    Architecture and engineering

    Stamped drawings and structural engineering by outside firms we coordinate and hold to the budget.

  3. 03

    Scope table and budget

    Every trade priced by its specialist. You see the line, the scope of work and the number.

  4. 04

    Permits and selections

    Permit submitted while selections are finalized against a schedule, so lead times never stall the site.

  5. 05

    Construction and communication

    Trade dispatch, inspections, weekly updates and written change approvals.

  6. 06

    Closeout

    Final inspection, punch list, warranty documentation and as-built records.

Investment

What drives the number.

Most preconstruction engagements we take on fall between $8K and $40K, typically credited toward construction, depending on the drivers below. Ranges are drawn from Portland Project's signed contracts and reviewed annually.

Last reviewed September 2026. Planning guidance only; pricing is fixed only by a signed agreement after scope, selections and site conditions are known.

Whole-home remodel cost guide →

Structural changes

Bearing walls, new openings and foundation work add engineering, steel and inspection time.

Systems replacement

Full rewire, re-pipe and HVAC are common in pre-1960 homes and rarely optional once walls are open.

Kitchens and baths

The count of wet rooms and the selection level drive the largest single swings.

Hidden conditions

We recommend a 10–15% contingency on older homes and show you exactly how it is drawn.

Timeline

Plan for phases, not a date.

Durations depend on structural scope, permit review times and selection lead times. We commit to a schedule only once the scope is fixed.

Discovery and feasibility2–4 weeks
Layout, architecture and engineering6–12 weeks
Scope table, quotes and permit submission3–5 weeks
How long does a whole-home remodel take? →
Questions we hear

Design & preconstruction FAQ

Can we live in the house during the remodel?

Sometimes, in phases. If the kitchen, all bathrooms or the electrical service are in scope at once, moving out is usually cheaper and faster than phasing. We model both and show the cost difference.

Do we need an architect?

For structural changes and permits, yes—stamped drawings are required. We do early layout studies in-house, then bring in an architect and engineer we coordinate as part of the scope.

How do change orders work?

Any change to scope is written up as its own line with a price and a schedule impact, and approved by you before the work proceeds. Nothing is added to an invoice that you have not signed.

Who is on site day to day?

The specialist trade for that phase, dispatched and sequenced by us. Dennis or the project manager is on site at each phase transition and inspection, and reachable throughout.

Plan your preconstruction engagement

Start with the house, the goals and a realistic number.

We'll tell you honestly whether the scope and investment line up before anyone books a site visit. Or call 503-567-5676.

Step 1 of 4 · Then the address, the project, and where to send your site-visit details. About two minutes.