Second-story addition · Alameda, NE Portland

A finished attic became a full second floor: three bedrooms and a bath, built on top of an occupied house

Added
429 sf second floor
Program
3 bedrooms, full bath (the home's 3rd)
Structure
LVL floor, shear walls, new footing, truss roof
Permit
City of Portland · FIR program
Construction
May – Nov 2023, family in residence
The finished house at dusk: new hip-roofed second story over the original single-level Alameda home
The starting point

One small attic room, and a family that had outgrown the main floor.

A well-kept Alameda home with a single finished room tucked under the roof. The owners loved the street and didn't want to move, but they needed real bedrooms upstairs and a third bathroom, without giving up the yard.

They came to us with schematic drawings from their architect. Our job was to turn them into a priced, permitted, buildable project and then run it with the family living downstairs the whole time.

What made it complex

You can't set a second floor on a house that wasn't built to hold one.

The addition is L-shaped rather than the full footprint, which meant the existing ceiling joists under it had to be sistered with LVLs, several exterior walls had to be converted to shear walls (siding off, sheathing replaced, hold-downs added, siding back on), and a new column had to be carried from the center glulam down through the house to a new spread footing poured in the basement.

Above that: a truss-framed hip roof set by hand because power lines ruled out a crane, spray-foam under the sheathing for an unvented attic, and a short-ducted heat pump living in that conditioned attic space. The existing roof overhang was kept and wrapped into the new work as a canopy line. Because the house was occupied, the existing radon system had to be extended through the addition, and the whole house got a new roof, gutters and downspouts once the second floor was closed in.

The new second floor

Matched to the house, not bolted on.

Same Hardie siding and vinyl windows as below. White oak tongue-and-groove floors to match the main level. A bath with a skylight, hex-mosaic floor, subway-tile surround and a Caesarstone counter. Built-in closets so the bedrooms actually work as bedrooms.

Walk through it

3D tour of the finished house.

Open full screen →
Scope

What it took to get there.

Design, engineering & permit

Architect's schematics developed to permit set; structural calcs; City of Portland FIR permit and inspections

Demolition

Attic room and roof removed; old insulation out; protection of the occupied main floor

Structure & framing

Basement footing and column, LVL floor sistering, shear walls, second-floor framing, hand-set roof trusses

Roof, gutters & envelope

Whole-house roof, gutters and downspouts; house wrap, Hardie siding, matching vinyl windows, skylight

Mechanical, electrical, plumbing

Ducted heat pump in the conditioned attic; new bath plumbing chased to the basement; wiring for the new floor; radon extension

Insulation, drywall & finish

Spray foam roof deck, batt walls, drywall, white oak floors, tile, vanity and stone, closets, doors, trim, paint

Site & drainage

Camera-scoped rain drains and repaired the failed front line found during the project

Follow-on work

New front door and lockset, garage window, garage door and opener, laundry shelving

How it was run

Sequenced to the day, with the architect walking the site at every phase.

The schedule ran as a week-by-week Gantt from the kickoff meeting to the final walkthrough: windows and plumbing fixtures ordered three weeks ahead, dumpster in the driveway so the neighbors couldn't fill it, the electrician on site the day after demo to pull old wiring before the floor was sistered, trusses verified and ordered while walls were framed, and the inspector coordinated by photo where the code allowed.

Field conditions were logged and priced as they came: an access panel opening that didn't match the spec, a rain drain that failed its camera inspection, a radon exhaust that had to be rerouted above the new roofline. Each became a written item the owners approved before the work proceeded.

“Dennis and Kim were extremely helpful in initial stages of design by providing us with costs for various structural design elements to help us budget effectively. Overall the work is fantastic.”
Gwen M. · Homeowner